Patios in Sale
Porcelain, Indian stone and flagged patios, paths and steps, laid on a compacted base with falls that drain. Sale is our home base.
Patios for Sale Gardens
A new patio in Sale needs a good fall and a solid base, because water sits on flat paving over clay. Plenty of older patios around Sale Moor were laid level, or towards the house, and puddle every time it rains.
We cover Sale and the surrounding area: Sale Moor, Ashton upon Mersey, Brooklands, Sale West, Priory and beyond (M33).
Get a Free Sale Quote
What’s Included
We dig out, compact a stone sub-base and lay the slabs on a full mortar bed with a fall away from the house, keeping it well below the damp course. Porcelain is the popular choice on Sale’s 1930s semis, often with a step down to the lawn and a path through to the shed.
- Dug out and laid on a compacted stone sub-base
- Full mortar bed, not dot and dab
- Falls set away from the house, below the damp proof course
- Porcelain, Indian stone and concrete flags
- Paths, steps and front entrance paving
- Joints pointed to suit the stone
How It Works
Patios in Sale FAQs
Usually because it was laid without enough fall, or the base has sunk in the clay. We relay patios with a fall away from the house on a compacted sub-base so the water runs off.
Porcelain in a grey or buff tone suits most of them, and Indian stone works well if you want a more traditional look. We bring samples so you can see them against your brickwork.
Porcelain is uniform, very hard-wearing and easy to keep clean, which suits a modern house. Indian stone has natural variation and texture that suits older properties and cottage-style gardens. Both need the same groundwork. We bring samples of each to the quote.
A patio in a back garden at ground level does not usually need planning permission. Paving a front garden over five square metres does need permission unless the surface is permeable or the water drains to a lawn or border. Raised terraces and listed buildings have their own rules.
A typical back garden patio takes a few days to a week, depending on size, steps and how much digging out is needed. We give you a timescale with the quote. The paving needs a day or two for the mortar to set before heavy use.