Patios in Timperley
Porcelain, Indian stone and flagged patios, paths and steps, laid on a compacted base with falls that drain. Timperley is about two miles south of our Sale base.
Patios for Timperley Gardens
New patios in Timperley often replace a small, dated area of concrete slabs outside the back door with a wider terrace that runs the full width of the house.
We cover Timperley and the surrounding area: Timperley village, West Timperley, the Navigation Road side, the Baguley border, Timperley Brook and beyond (WA15).
Get a Free Timperley Quote
What’s Included
Wider patios need careful levels, especially where a garden slopes away or where doors open straight onto the paving. We set the height below the damp course, lay a fall towards the lawn and build in a step where the levels change. Indian stone suits Timperley’s older brick homes, with porcelain chosen for newer extensions.
- Dug out and laid on a compacted stone sub-base
- Full mortar bed, not dot and dab
- Falls set away from the house, below the damp proof course
- Porcelain, Indian stone and concrete flags
- Paths, steps and front entrance paving
- Joints pointed to suit the stone
How It Works
Patios in Timperley FAQs
Yes. We set the levels against the house and doors, lay a fall away from the walls and add a step to the lawn where the ground drops.
Porcelain often suits a modern extension with large glazed doors, while natural stone sits better against older brick. We bring samples of both.
Porcelain is uniform, very hard-wearing and easy to keep clean, which suits a modern house. Indian stone has natural variation and texture that suits older properties and cottage-style gardens. Both need the same groundwork. We bring samples of each to the quote.
A patio in a back garden at ground level does not usually need planning permission. Paving a front garden over five square metres does need permission unless the surface is permeable or the water drains to a lawn or border. Raised terraces and listed buildings have their own rules.
A typical back garden patio takes a few days to a week, depending on size, steps and how much digging out is needed. We give you a timescale with the quote. The paving needs a day or two for the mortar to set before heavy use.